STANDARD TECHNICAL

PLAN OUTLINE

Because the purposes of companies vary widely, their Technical Plans will vary

widely as well. Once established within an enterprise however, the outline and

purpose of the Technical Plan will be relatively constant. The content will, of

course, change from project to project.

The basis of the following Technical Plan Outline is MIL-STD-490. It is purposely

comprehensive. Start with this outline and modify it to your needs.

STANDARD TECHNICAL PLAN OUTLINE

TABLE OF CONTENTS

Part I—Technical Planning and Control

Paragraph Title

1.0 Organization

1.1 Objectives

1.2 Responsibilities

1.3 Authority

2.0 Decision and Control Process

3.0 Configuration Management

3.1 Hardware

3.2 Software

3.3 Documentation

4.0 Review Process

4.1 Design Reviews

4.2 Subcontractor Reviews

4.3 Design Approval and Certification

5.0 Continuous Acquisition and Logistic Support (CALS)

6.0 System Test Planning

7.0 Technical Performance Management

Part II—System Engineering Process

Paragraph Title

1.0 Technical Strategy

2.0 Functional Analyses

3.0 Requirements Allocation

4.0 Generation of Specifications

5.0 Alternative Designs

6.0 Trade-offs

7.0 Synthesis

S TA N D A R D T E C H N I C A L P L A N O U T L I N E 225

Part III—Specialty Engineering Plans

Plan Title

1.0* Concept of Operation

2.0* Configuration Management Plan

3.0 Contamination and Corrosion Control Plan

4.0 EMI/EMC Plan

5.0* Engineering Plan

6.0 Environmental Engineering Plan

7.0† Hardware Development Plan

8.0 Human Engineering Plan

9.0 Logistic Support Analysis (LSA)

10.0 Mantainability Plan

11.0 Manufacturing Management Plan

12.0 Mass Properties Control Plan

13.0 Packaging, Handling, Storage, and Transportation Plan

14.0 Parts, Materials, and Process Control Plan

15.0 Producibility Plan

16.0 Production Engineering Plan

17.0* Quality Plan

18.0* RMA Plan

19.0 Requirements Plan

20.0 Safety Plan

21.0 Security Plan

22.0† Software Development Plans and Standards

23.0† Software Quality Plan

24.0 Standardization Plan

*Subplans, in addition to the Program Plan and Technical Plan, that should always

be a part of the proposal or at least be completed at the time of the proposal. Other

plans may also be a part of the proposal based on the nature of the requirement.

†Subplan to be included with the above dependent on the output product.

TEAMFLY

25.0* System Test Plan

26.0* Technical Data Management Plan

27.0* Technical Performance Measurement Plan

28.0* Technical Risk Management Plan

29.0 Value Engineering Plan

30.0 Vulnerability/Survivability Plan

31.0 Weight Control Plan

*Subplans, in addition to the Program Plan and Technical Plan, that should always

be a part of the proposal or at least be completed at the time of the proposal. Other

plans may also be a part of the proposal based on the nature of the requirement.